Hornsby Industrial

Darug and GuriNgai peoples

Hornsby Council

MLP Co

Photography
Elever media

Designed from an existing concrete batching plant on a sloping site down to Hornsby creek this warehouse consists of:

  • 130kw roof solar system with total roof access and ladder
  • Steel structural frame with metal sheet cladding
  • Fire rated – concrete precast panel
  • Metal sheet roofing with fibreglass inlay for natural lighting
  • Burnished concrete floor
  • Suspended slab hardstand

Build numbers:

  • 1,146.39sqm total building
  • 173.04sqm office including open plan office, board room, kitchenette, Amenities & covered external patio.
  • separate dock office.
  • 11m clearance height
  • 6m high dual roller doors
  • 130kw roof solar system
  • 12 car spaces
  • Hardstand for 2 HRV